The Bus, week 4, 04-10-98. The Demolition continued.

Work has slowed down a bit, due to other work (making a living) and some bad weather. As most of this work was on the outside of the bus, and it is parked behind my house, I need some dry weather to go on...
The raising of the roof is more complicated in this bus, than I expected. The window pillars are actually curved, not straight, and some of them have rusted through into the framework. This requires cutting them out with a blowtorch and replacing all of them with new, longer (and curved) pillars.
Therefore I decided not to do this myself, but have it done by a couch design company in the next few weeks.




Previous | Next